A Brief Look at Bus Ridership Numbers in Madison, WI 2019-2025

Susan De Vos | October 17, 2026

In 2019, Madison’s mayor wrote in her introduction to the 2020 capital budget that she wanted to see annual bus ridership reach 18,000,000, from under 13,000,000. She wrote about being ... committed to doing this through the dual lenses of equity and sustainability. ... and to doing it in a fiscally responsible way. Then the pandemic hit.

 

 

IntroductionThis blog is shortened from a longer piece that itself was limited to issues of ridership numbers between 2019 through 2025. Because even the situation with the numbers themselves is complicated enough. Now that time has gone by, dust has settled and more information has come in, it is finally possible to make an appraisal.

We consider four issues: 1) the pandemic; 2) the network redesign; 3) the addition of Automatic Passenger Counters; and 4) the start of a Bus Rapid Transit line. Together, they help us understand the efficiency side of a public program’s efficiency/equity construct.

 

The Pandemic Ridership dropped by an estimated 63% in 2020 compared to in 2019. As people adjusted to a new reality, regular 40' buses were limited to 15 passengers and ran on a reduced Saturday schedule during the week.

FIGURE 1
/div>
Source: March 2026 Complete Monthly Ridership data from National Transit Database (https://www.transit.dot.gov/ntd)

Nationally, the average recovery in bus ridership by the first quarter of 2025 was about 85%. Metro-specific figures from the Federal Transit Administration ’s National Transit Data Base (FTA’s NTDB) for the whole year of 2025 (not just the first quarter) suggest that the rebound in the Madison Area was closer to 100%. See Figure 1.

The blue line in Figure 1 shows the actual number of rides (unlinked trips) on Metro as reported by the FTA. The yellow line shows what an 85% recovery by 2025 might look like. The red line reflects a full recovery trajectory.

The steepest rebound – 53% – appears to have occurred between 2021 and 2022 before any redesign. The rebound between 2022 and 2023, though still on a full recovery trajectory (depicted by the red line) was a much lower 13.5%. Metro’s 2023 Annual Report described the latter increase as “steep” however, coyly suggesting that the steepness was due to the network redesign of 2023 rather than comparing 13.5% to the steeper earlier increase of 53%. An example of self-serving misinterpretation?

 

Network Redesign Madison’s transit system underwent a radical redesign even as the pandemic raged. Launched in June of 2023, service hours had reverted back to the pre-pandemic level. The new system would leave about 72% of Madison residents within about the same distance from a regular bus as before but about 20% would live farther away and 8% would be closer. Outside of a handful of core routes, most lines would have 30 minute intervals between service with reductions to 60-minutes on weekends and late evenings.

In an online oral presentation of the proposed scheme in early 2022, a city transportation planner suggested that the cost of operating the new BRT line would be equivalent to about 20-25% of Metro’s operating budget then going to the operation of local mainline buses. He also opined that the new system would be more equitable.

There was special difficulty in having adequate public participation among the bus riding population during the pandemic however. There was also an unanticipated difficulty in obtaining  additional local funds for operating the BRT line. This caused some people to favor waiting for RTA-enabling legislation that could produce the additional operating funds before redesigning the system. That had seemed to part of the Mayor's position when running for mayor, after all. Instead however, the Mayor took already inadequate operational funds from a local bus system that often serviced vulnerable and underrepresented populations to finance operation of a new BRT line – in the name of equity no less.

Technically, a BRT system is supposed to add to a local bus system since the two bus systems are very different, And interestingly enough, original plans on Metro’s website seemed to acknowledge this: The proposed BRT ... will complement, not replace, Metro’s current service. But such remarks were scrubbed from Metro’s later website. Could it be best for those in charge not to remind the public that a BRT line is supposed to complement, not replace, a local bus line?

     Proof Positive? Soon after the redesign launch, the Mayor issued a blog claiming that the transit network redesign proves positive ... and that preliminary numbers show us that ridership this June when compared to June of 2022 increased by 5%. That is a great initial indicator that better service encourages greater ridership, ... . However, without any change in route design, one could expect ridership in June of 2023 to be more than in June 2022 just due to recovery from the pandemic.

The Mayor also argued that the 2023 number could be deceptively low because the redesign had “ ... greatly reduced the number of transfers that riders need to make to complete a trip. ...” Probably. We just do not know.

 

Automatic Passenger Counters In a major upgrade, Metro installed a new Automatic Passenger Counter (APC) system in the summer of 2024. It had been trying unsuccessfully for years to add to its older farebox method. But matters came to a head in early 2024. There were reports of buses having zero passengers according to farebox counts even when those buses were known to have passengers. You can see this when looking at the blue line in Figure 1 above. The line‘s 2024 figure reflects the official data that had to be reported to the Federal Transit Administration despite the known shortcoming.

The new passenger counter system – the IRMA MATRIX – uses a sensor mounted over a door that can tell whether the passenger is entering or alighting. It uses its own infrared light and transmits data via a PoE or Power over Ethernet system.

Although nobody appeared to contest the APC-derived counts, they had to go through a rather rigorous verification procedure before being certified by the Federal Transit Administration. That included checking and re-checking IRMA MATRIX counts with manual counts. In the meantime, the FTA database had to report the distorted 2024 figures. In recently showing the chart reproduced at the top of this essay – of annual ridership figures for Metro from 2003 to 2025 – the Greater Madison Metropolitan Planning Organization (MPO) had to make it clear that the 2025 numbers were not yet official. It appears that a few months later they finally are.

 

Bus Rapid Transit Soon after installing the new counting system, Metro launched its starter Bus Rapid Transit line on Sept. 22, 2024. It appears that the city was so intent on claiming the new BRT system a success however that it compared 2024 counts from the new counting system with 2023 counts from the old counting system. Is that a valid way to compare?

FIGURE 2

Source: https://www.cityofmadison.cominews/2025-01-29/early-ridership-numbers as of June 22, 2026

As there were different numbers floating around at the time, and my own appraisal was yet again different (I used the certified numbers), I thought it best to wait until the dust could settle and we could get better sanctioned numbers. But it was disappointing that such numerically-knowledgeable people as the engineers heading the city’s Department of Transportation and Metro Transit were willing to compare uncomparable figures because it fit their narrative. And it was disappointing that the media would uncritically parrot those numbers.

    Rapid Route A Route A did not exist before 2023 and did not become a BRT line until 2024. Thus the time span in Figure 3 of only a couple of years is not ideal but at least better than using figures for only one year. Figure 3 refers to December only because the figures for November (in Figure 2) were similar. The red line reflects the official counts provided by a public records request (now presumably required by Metro for any information). That includes the undercount in 2024 and the APC count in 2025. The blue line reflects the more accurate but still unofficial APC counts (also shown in Figure 2) and the green dotted line shows the hypothetical extension of the blue line to the finally certified 2025 APC counts. That green dotted line depicts an increase of over 19% while Route A ridership in December accounted for close to one sixth of the system rides. Although Route #80 on the UW-Madison campus had more passengers in 2024, Route A had the most by 2025.

FIGURE 3

Unofficial figures from Figure 2, Official figures from Metro Transit Sept. 11, 2026
and hypothetical figures based on simple rate of change calculation for rides 2023-2025.

It is way too early to assess what this means, but the numbers are going in a good direction.

 

Concluding Remarks

The purpose of this essay has been to clarify the ridership numbers of Madison’s bus system during the tumultuous years of 2019 through 2025. Given all the alternative facts swirling around at the time, it was necessary to wait until the dust could settle and more information came available before trying to get to the real story. We could then deal with four major ridership-related events: 1) the pandemic, 2) a “revenue neutral” network redesign aimed at installing Bus Rapid Transit, 3) the addition of a sophisticated automatic passenger counter system, and 4) the launch of an east-west Bus Rapid Transit starter line. Together, these ridership issues form the basis of an efficiency part of a public transportation system’s efficiency/equity construct.

The story is mixed and may have inadvertently left out critical pieces of information. It includes the story of a robust system bouncing back vigorously from severe strain. It describes the misinterpretation of numerical figures from people who most certainly knew better but found support for what they wanted you to see. It is the story of a well thought-out Plan A thrown in the loop by a pandemic, by a hostile state legislature and Supreme Court and by the lack of a Plan B.

In the end, it leaves me recommending something that I recommended years ago: We need to put more flesh on a sound skeleton. Madison, Dane County and the state of Wisconsin need to re-prioritize their transportation budgets so more funds go to transit in a transparent manner. Redesigning the bus system using a pre-2019 “revenue neutral” cap that cut local bus service was NOT the way to go. Especially when the city of Madison’s Mayor had just finished giving Dane County $1.9 million to widen – without transit – the road from Cottage Grove into Madison. We need a system that at once includes Bus Rapid Transit, truly embraces the democratic idea of community engagement, and applies true notions of access, equity and frequency.